It is the responsibility of anyone who orders a building through this site to ensure they are aware and understand these terms and conditions and if necessary seek professional independent legal advice in relation to these terms. Any product purchased through this site will be subject to these terms and conditions of sale:
1. What you are purchasing is the components for a structural steel building. It is not an RTA toy. This building needs to be installed in compliance with the structural engineering supplied. This building is made from standard Rollformed materials which may require cutting and fitting to construct this building.
2. The supplier makes no warranty regarding the suitability of the product for the Clients specific purpose or the suitability for the Clients specific location. It is the responsibility of the Client to satisfy themselves of the suitability of the product purchased for their own specific purpose.
3. The purchasing of any goods through this site is subject to the Client completing the three page quote-confirmation document which will be emailed to the Client upon receipt of the online order and payment of the required funds. The contract between the Client and the Supplier will not binding until the Supplier receives the completed three page confirmation and payment.
4. Important: The design class of the kit building quoted is shown on page 1 of the quote-confirmation. Unless stated otherwise on page 1 of the quote, this kit is not designed for Class 1a (livable buildings). The Supplier makes no claims of this building satisfying Class 1a design unless specifically designed for the purpose and stated on page 1 of the quote.
5. Each kit building is designed in accordance with the structural design specification detailed within the inclusions area of the product description. This design is based on the At the time of placement of order the Client is given the opportunity to provide the site details where the kit is to be constructed. Upon receipt of order third party engineers shall reference this site information using mapping software (google maps, etc.) to determine if the site satisfies the engineering specification quoted. Where the site conditions satisfy the engineering specification, the Supplier shall provide a signed Government Approved certificate of compliance from the third party engineers. Where the engineering specification is not satisfied by the site conditions, the Supplier shall provide the Client with the opportunity to change the ordered building to a design which suits the site conditions with the Client to pay any costs associated with the change. Should the Client not accept these changes the Supplier shall either:
(a).Cancel the order and refund any monies paid, or;
(b).Supply the building with a covering letter of structural compliance stating the structural design criteria of the building supplied in lieu of the certificate of compliance for the relevant site.
6.Where the Client submits the engineering provided for submission to a building/planning authority for approval to construct, and where the Client has paid a deposit only and not authorised for the manufacture of materials (pending building approval), should the governing authority reject the building/planning application, the Supplier shall refund the amount paid, less any third party or administrative costs, subject to the following clauses:
(a).The Client provides the Supplier with a letter from the governing authority outlining the rejection of the application,
(b).The site location does not allow for the building to be constructed. i.e: the governing authority will not let the Client build over an easement,
(c).The Client cannot place the building in another location that will be approved by the governing authority,
(d).The Client cannot change the building to a design that can be approved by the governing authority,
(e).The Client returns the engineering certification and structural documents and agrees to not use any of the information provided by Supplier in any future building/planning application.
7. The kit building will be supplied based on the structural design nominated by the Supplier and the Supplier reserves the right to amend any quoted design at its own cost.
8. It is important to note that these kit buildings are produced in the majority by third-party "rollforming companies" as required. The framing, cladding, doors and windows are all made to order and the finished product is not a stock item. Once the product is made it is non-returnable to the supplier. As the materials for our buildings are produced as required by third parties, any change or cancellation after productions commences, any materials produced (including any costs expended) shall be at the expense of the Client.
9. Important: All manufacturing times are quoted as an estimated lead time due to the product being unmade at the time of order. Lead time are established by third party suppliers who estimate availability of raw materials. The actual manufacturing and delivery time may vary according to raw material availability, manufacturing and delivery factors out of the Supplier, and their third party material suppliers, control. Cancellation of order by client due to extended or altered delivery times will be subject to clause 14 of this contract.
10. These kit buildings are produced and consolidated as required by third party suppliers. These third party suppliers do not provide a long term storage solution for completed buildings. It is a requirement of this contract the client takes delivery within four weeks of notification of the kit being ready. Should the client not take delivery within four weeks, the Supplier reserves the right to charge storage at a suitable location and/or any relevant pricing adjustments or storage costs passed on by third party suppliers. These charges are to be paid in full prior to delivery or collection of the kit.
11. Should the Client not accept delivery or collect within eight weeks notification of being ready, the order will be cancelled in accordance with clause 13 of this contract.
12. The Supplier has a responsibility to its employees to provide a safe workplace free from abusive conduct. The Supplier has a zero tolerance approach to any kind of abusive conduct. Any threatening or abusive conduct towards staff or management, be it verbal or written, shall result in immediate cancellation of the order in accordance with clause 13 of this contract.
13. Any cancelled order for partially produced buildings shall be refunded less the cost of any material produced, structural certification fees, third party costs and administrative costs. Due to third party contract terms, where more than 50% of the kit materials have been produced, the kit will be completed and the refund will be subject to clause 13 of this contract.
14. Where an order is cancelled in accordance with clauses 8, 10, 11 or 12 above, the Supplier reserves the right to sell these items unreserved via any public sale method available and refund the client at the value of the re-sold price less the cost of any expenses (auctioneer fees, etc.) incurred.
15. Where delivery is quoted, it is the responsibility of the Client to provide the completed delivery information page within the quote-confirmation. As this site information may not have been provided prior to entering the contract, the Supplier reserves the right to amend and/or decline any quoted delivery charge based on the clients site information provided within this contract.
16. The products supplied are warranted by the material manufacturers. Any warranties provided shall be subject to the terms of the material manufacturers. the Supplier shall provide copies of manufacturer warranty terms for the specific job upon request.
17. Important: The Supplier will provide to the client a material check list prior to delivery. It is the responsibility of the Client to check the delivered components at the time of delivery and advise any material damages, production errors by completing the packing check list supplied and returning via post or email. As the third party suppliers require correctly reported written notification of any shortages, damages or errors, the Supplier will only accept a correctly completed packing check list as notification of any errors. Verbal reporting of errors or damages will be ignored by the Supplier as they cannot be actioned with the third party suppliers. Material are to be checked on a day prior to erectors commencing construction.
18. The Supplier has only 24 hours to advise third-party material suppliers of shortages, damages or errors. As the Supplier cannot be responsible for the security of the Clients site, any claim for shortages, damages or errors will not be accepted after Client takes possession of materials. It is the responsibility of the Client to check the kit materials for any damage that may have occurred during manufacture or transport. Damage to product must be reported within 24 hours of possession AND BEFORE COMMENCEMENT OF ANY CONSTRUCTION OF THE KIT MATERIALS. It is the responsibility of the Client to thoroughly check the materials supplied before construction commences. For the avoidance of assigning blame, the Supplier will not accept any claim for material shortages or damages or errors after construction commences. The Supplier will accept no responsibility for any construction loss of time or costs associated caused by failure of the Client to correctly check the materials prior to commencement of construction.
19. All kits are supplied with structural engineering. The engineering details is sufficient for a suitably qualified person to erect the building supplied. It is the responsibility of the Client to ensure that whoever is engaged to erect the building is sufficiently educated and experienced as per the requirements of the relevant state building control body. The erector is required to have reading, writing and arithmetic skills equivalent to a secondary education level. The erector is required to know and possess the correct tools to work with steel structures. It is the responsibility of the Client to ensure whoever erects the buildings reads the engineering and any other details provided before commencement and is comfortable with the requirements and procedures to erect the building. The Supplier, and its third party suppliers, take no responsibility, from whatever source, for plea of ignorance in erecting this building once construction commences.
Select your shed in our webstore, add to cart then complete your details and send, no payment is required.
We will email you a confirmation detail of the building you have selected to complete for ordering and payment should you choose to proceed.